Projects across the UAE

Villas, penthouses, hotels, showrooms and storage across the UAE. Each project page names the unit installed, its rated capacity, the humidity readings before and after with the date and the meter used, and photos from the job.

The first installations are being documented. A project is published here only with photos, dated humidity readings and the owner's consent, never as a sample.

Isometric illustration of the ducted dehumidifier: a slim green box with humid air going in at one end and dry air out at the other

What every project page records

  • The unit installed, with its rated capacity and airflow from the datasheet
  • Relative humidity before and after, with the date and the meter used
  • Duct routes, grille positions and where the condensate drains
  • Installation time and what changed for the owner
  • Photos of the ceiling void, the grilles and the controller

Planning a similar installation?

Send the floor plan or a few photos on WhatsApp. We size the system, quote it and document the result the same way.